Answer Posted / manikandan
11.5 bag/m3 of concrete
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
how to check and keep control on the wastage of material at site
What is the difference between undo & redo?
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete
2nd and 4rt angle elevation used in which country ?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft
how to find out hard strata in bored pile when the DMC method adopted.
Which are the top apps for you civil engineer?
Which is the direction for positive angle?
what is meant by csr in foundation? what is sbc?what is meant by contour line?
Define What is the tallest man made structure in the world?
How to calculate quanty of steel in four leg stirrups?
Define the various stages of the project planning process in construction.
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?