Answer Posted / abc
100 Sqft = 9.293 Sqm------A
9" = 0.230 M--------B
Volume of B/w = A x B => 9.293x0.230 =>2.137 Cum
Nos. Bricks @ 494 Per Cum. => 494x2.134 = 1056 Nos.
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
how to design and calculate materail quantity for concrete speedbreaker ?
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
What is the Null Point of chimney in Power Plant
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
how many BSCs can i connect to the HUAWEI MSC
Explain how you can use different dimension tools in CAD? What are the different dimensions available?
What will you do if you encounter problems like accidents?
what is relation between SPT N value and driving piles after conducting a soil test?
What is .Dwg?
how we calculate the vol.of wet concrete..?
What is the development length given in pile?
How to arrive dry volume of concrete (1.52 to 1.57) ?