Sir your company in receiver ment of civil engineering.
Answer Posted / treninig engineering
Sir I am civil engineering .and I am diploma holder of that try of the job have you company in receiverment of fresher
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
how much of the strength comes from post-production curing
any book or article on pumped concrete.
what are the layers of the national and heir aprox thickness??
Define What happens to Load at yielding ?
what is diversion?
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
What is kn measurement?
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
Define What is the distance between railway tracks?
wat would be the probable interview questions and GD topics for IOCL exam?
What are the advantages of cad software?
Which ratio use for cement selery???
please send me bhel questions on rupesh.017@rediffmail.com