Answer Posted / dimpi
1700 kg
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
Explain what is structural frames or systems?
what is education Cess.
For making a new road in a village having a school & hospital , tell the steps of construction systemically ?
How will be cutting in timber plate size 600*400 column size
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
Define What is the force exerted by the Tacoma narrows bridge?
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
natucher of concrete &type of concrete?
Define What are the uses of Groynes?
why development length = 50D . why not 100D
What is progress payment?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com