Due to the sensitive earth fault Our Power plant Get Tripped Several Times, It happens in the morning time daily, When temperature rises that means sun rises the earth fault current get lower, in this situation What should I do to get rid of this Problem?
Answer Posted / rahul anand
generaly recomended that relaysetting forline must not exceed more than 3 seconds but we can also put 5 second during winter if we find frequent tripping of lines
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
How do you consider that you can improve and what assistance do you need to achieve this
operation
explain how the third harmonic content of the magnetising current affects transformer design
im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
why do you consider yourself a suitable candidate for this position
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
what does mean by kva rating
procedure of how to generate power in solar plant.
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon
How We Calibrate the vaccum transmitter?
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
By any way can we increase the B check hours from 300 to 500
what is the meaning of SST300 V56A in SIEMENS turbine