Answer Posted / raja2016
time taken for 1 scan sequence ::
Housekeeping -I/P update - Program execution - O/P update - Programmer windows - System communication window - Housekeeping
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
In my company plc based winders are operated. one day there was a data transmission failure alarm shown on pc. as per sir instruction we have reset master plc but winders were not triped and alarm gone. so what master plc do?
draw the block diagram of a level transmitter ?
How u measure the massflow in orifice flow measurement techniques
Why MUX JB's are using only Temperature Element in Fundation field bus?
How many interlocks at turbine side?
Instrumentation symbols interpration, P& ID, Logic diagram analysis, Electrical drawing analysis.
diff between neutral ,ground,phase , earthing and shielding?
how to calibrate corollaries (Mass flow meter)?
Why rdt and thermocouple both give different output .and one things more, how to generate ohm or mili volt plz mail me merajalam143545@yahoo.com
How do you identify an orifice in the pipeline?
What is furnace draft control?
Which is the best field foundation bus. ( FF ) Yokogawa, Honeywell or others ?
Name different parts of a pressure gauge.
To become an Instrument DESIGN engineer, is there any softwares or training to become Instrument Design engineer, plz suggest me, Iam very much interested in designing.
Operational amplifiers