Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

.What is drip and drain.

Answer Posted / rahul anand

well in power plants drippumps are also used to pump water back into deaerator when stem gets condensed either in GSC or it could be in HP/LP heateors.
Drain is not a part of close loop system ie either we are reusing in water (dm water system)

Is This Answer Correct ?    5 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

explain how the third harmonic content of the magnetising current affects transformer design

3257


why do you consider yourself a suitable candidate for this position

7431


what is the meaning of SST300 V56A in SIEMENS turbine

4342


dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job

2529


why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.

3237


our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....

1693


How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.

2274


Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.

3397


By any way can we increase the B check hours from 300 to 500

2180


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

2467


procedure of how to generate power in solar plant.

1942


operation

1878


How to calculate power press toneage

2048


how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?

1685


what's the moog valve

1487