How can we improve the capacity of a existing foundation?
Answer Posted / sagar boda
provided other foundation near existing foundation so load is distributed or provided jacketing to the foundation.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
What is the zero value in quantity surveying
What is the difference between one-way slab and two-way slab?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
what is castigliano theaorem
how do you stabilize a waterlogged area in road construction
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
How much cement will require for 1Rmt Skirting laying
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
what is high type road and low type roads
what is stressing
how to calculate total cost for slab 35'×8'
Please tell me vasthu room sizes. Thanks.