1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3
Answer Posted / vijay kumar mukhiya
80 blocks can done by a mason in a day with 1 helper and 10m2 plaster work done by a mason with 1 helper
| Is This Answer Correct ? | 73 Yes | 14 No |
Post New Answer View All Answers
What expenses counted in contingencies and how much it is in related to built-up area of the building.
how to calculate the chair reinforcement length in slabs, footing or anywhere??
if 20mm aggregate is coming by weight 25 ton in a 10 wheeler hywa ,then what will be total volume of aggregate in cubic feet.
Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete
What is thumb rule in quality and quantity estimation of a Residential building??
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
how much area can be platered by a mason for exterior
what is parametre for M25 after 7 days strength
How much time Required for PPR pipe network testing
Can we use the flyash bricks in brick bat coba?
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
WHAT IS YOUR CURRENT SALARY
Wats the formula of eccentric footing and how was calculated from concrete qty
what's the formula for calculate pcc for matt(45mm aggregate)?
how much required strength of cement concrete bricks(size 230x115x75mm)