Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

INtools Trainining

Answer Posted / paresh.patil123

World-class Design & Detail Engineering in Instrumentation Training using Smart Plant Instrumentation( INtools) software.

Our practical and innovative training programs are designed to develop tomorrow’s industry and business leaders.
Meeting the needs of tomorrow’s world requires innovation and ingenuity, a sound understanding of technology and business, the skills to organize and direct and the vision and determination to lead. These are among the skills and attributes our students develop.
Studying with us, you'll also develop excellent design & detail Engineering knowledge, industrial exposure and integrating studies.
Our teaching staff brings together experts in the fields of Design & Detail engineering, and engineering management. We're proud that our students go on to fulfill our company aim: making organizations perform better through excellent Design & Development and management.
Why Monarch Solutions:
 We knows what exact industry required
 Complete Interview preparation
 Live Project Based Training
 Complete guideline for interview preparation.
 Successful track record of 7 years training
 Large network for placement
 Having won project records
 Monarch is only one training institute in India which having lot of experience in Design & Detail engineering Project execution Experience.
 For more details check-out web site www.monarch-india.com.




Topics covered in this course are:
1) System and Project Administration Overview
2) Instrument Index
3) Process Data
4) Calculations
5) Specifications
6) Wiring
7) Loop Diagrams
8) Hookups
9) Foundation Fieldbus
10) Brief overview of Field Bus, External Spec Editor, External Process Data Editor and Integration Specific to SPI

Guide Line for Design & Detail Engineering preparations:
11) Preparation Of Instrument Index
12) Preparation of Specification Sheets
13) Calculation of Orifice plate, Control Vale.
14) Preparation of JB grouping
15) Preparation of Cable Schedule
16) Preparation Of Hook-up drawings
17) Preparation of DCS & ESD specification.
18) Preparation of Tender Documents
19) Preparation of MTO
20) Preparation Of Technical Bid Analysis

Medium of Instruction: English
Duration: 15 days.

For more Information contact:
Paresh V. Patil
CEO - MTES

Monarch Techno Engineering Solutions Pvt. Ltd
1103 , B Wing , Mahavir Icon ,
Near Reliance Fresh,
Sector 15 , CBD Belapur,
Navi Mumbai - 400610
India.
Ph.no. : 022-27575299
Mob no: 91-8879640111, +91-9975796100
Web: www.monarch-india.com

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Q1: Consider part of a control loop, which excludes the transmitter, consisting of a process, a controller and a control valve which may be represented by two dead times of 0.5 min each and three exponential lags of 0.8 min., 1.0 min. and 1.5 min. respectively. We wish to express this system as an overall first order plus dead time (FOPLD) model ie gain, time constant and process dead time. (We will see later that this is often done, to simplify controller tuning). For this exercise, gain is considered to be 1.0. (A) If the transmitter is a flow transmitter whose behaviour can be described by a dead time of 0.2 min. and an exponential lag of 0.5 min. in terms of the overall dead time and overall first order lag how can the system behaviour be approximated ? Overall dead time = Overall time constant = (B) If the transmitter is a temperature transmitter with a temperature sensor in a protecting well whose behaviour can be described by a dead time of 0.7 min. and an exponential lag of 15 min. how can the overall system behaviour be approximated now? Overall dead time = Overall time constant =

1949


Isometric drawings are generated during _________________ phase of a project

2078


Hello to all....I am an Instrumentation Graduate and i am passed out in this year only.. I am unable to find the job in my core instrumentation.. so any boby tell me how to and where to search the job....please...and also tell me i there are any courses offered in the instrumentation stream so i can do it... you can send your suggestions to my mail-id i.e Ganesh20084u@gmail.com ... please..

1988


Draw a simple circuit for a well head control panel used to protect the well against fire, leak, blockage, ESD, & controls the operation of one downhole & one surface safety valve. Explain the operation and controls

1641


diff between neutral ,ground,phase , earthing and shielding?

2297


what is function of sensor, and how is it work , explain with difination

2387


What is the advantage of using locally fabricated hook ups over Pre fabricated hook ups in process instrumentation?

2043


What is offset in a control system.

9019


Calculate the maximum pressure drop that can be allowed to occur across a control valve, so that we can prevent cavitation / flashing from occurring. Use the following formula: Δ P allow = Km (P1 – PvapourA) where, Δ P allow - the maximum allowable differential pressure for sizing purposes, or terminal pressure drop; Km- the valve recovery coefficient from the manufacturer’s catalogue; P1 - absolute inlet fluid pressure; PvapourA - absolute fluid vapour pressure at the inlet temperature; Use Atmospheric pressure = 101.3 kPa, P1 = 1200 kPa(g), PvapourA = 4 kPa, KM = 0.72

2218


please send the drdo exam paper

2392


Why do we floating DC in DC system.

2899


How the warning lamp of a charging-system is activated ?

2639


I m appointed as an automation trainee engineer in small firm in that I am only the one , my company give me a project on s7-200 as i m beginner I don't know how to program so please send me the helpful site so that I complete my project before deadline....please help me out in this critical situation.

1988


Describe a time when you anticipated potential problems and developed preventive measures.

2918


HI, can anybody give details about GAS TREATMENT PLANT CONSTRUCTION,as INSTRUMENTATION ENGINEER what are the responsibilites.what are the instruments mainly instrumentation engineer will deal with

2096