Why silt content not allowed more than 6% for Sand ?
Answer Posted / naveen dixit
maximum silt content 3% as per is 383;1970 . 3 % up not using civil construction .
Is This Answer Correct ? | 10 Yes | 0 No |
Post New Answer View All Answers
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
five requirements of infill panels for walls?
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
Explain the advantages and disadvantages of using plastic and timber fenders?
What is Density of cement, sand & aggregate ?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
why we use 19x9x9and 20x10x10 but not other
What is the difference between undo & redo?
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
Why we provide hair pin for shed
What is absolute pressure? How absolute pressure is calculated?
where can i get the previous question papers for rrb section enginerr (civil)
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
specifications of fe500 steel
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?