How to calculate water cement ratio in mix desion
Answer Posted / abdul aziz
38% of weight of cement
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Tell me about triple point of water.
Why do you want to work here
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir
why we use 19x9x9and 20x10x10 but not other
what are the Task work of different labour.?
How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft
what is the weight of 10mm,20mm,40mm aggregate
04. a. Slenderness ratio…………… 1 b. If the height of a stage is 15-0 & dia. of the prop is 5, the slenderness ratio is….… 1 c. If the height of a stage is 10-0 & dia of prop is 3, the number of bracing will be…… 1
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
what is parametre for M25 after 7 days strength
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
In a concrete grade C35A, C & A stands for what and equalent cube strength?
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.