Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How will we calculate the number of cement bags in 6 foot by 6
foot footing?

Answer Posted / pavan

6 Foot * 6 foot* 6 foot ,first convert in to mts
1 foot = 0.3048 mts
so 6 foot = 0.3048*6= 1.828 mts
so 1.828*1.828*1.828=6.11 Cum
according to mix design or nominal mix cement content will be provided per cum.
example if min cement content is 380 kg/cum for m30 grade
6.11 * 380 =2321.80
or 2321/50 = 46.36 bags

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to find CN by using arcgis 9.3?

2432


What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?

2148


What type of tensile strength is handling by crank in beam? Thanks.

2522


Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?

2234


is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.

1960


How many square meter can mason layout chb per hour

2286


what is Bearing Capacity,How to determine it?

1293


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2871


Under what circumstances should pot bearings be used instead of elastomeric bearings?

1140


why do we not deduct volume of steel to find actual volume of concrete in practical???

1804


How much quantity water should be placed in one cubic meter area?

1313


que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?

2517


Forces in a Shear Wall are in plane or out of plane ?

1154


How much sand and cement requirement for 1 SQM 125mm thickness Brickwork

4504


If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?

1841