what is zenier barier and what means
zone 1,zone 2,and zone 3
Answer Posted / ram singh yadav
A Zener barrier is an associated equipment that is installed in the safe area. It is designed to limit the amount of energy that could appear in an electrical circuit passes through the hazardous area despite the connection before the barrier.
A barrier consists of:
1. Resistors to limit the current
2. Zener diodes to limit the voltage
3. Fuses to protect the components
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
use of split range ? where it is used ? in which control loop it is used ?
how u calibrate sox nox co2 co in cemps?what is opacity n HPm?tell the standard parameters of cems?
can any send me a forbes marshall dtron 316 manual
Can anybody tell me how to select the size of earthing cable for DCS & PLC system.Please tell me any relevant answer here or mail it to me.
how to calibrate 0- 150 psi presure gauge by dead weght tester
Can u tell me the principle of the tc,rtd,level switch,pressure switch ,transmitter(pr flow level temp.),vibration...plz
dear friends, i have seen flow as the selection critriea in presure guage (bourdon tube) and i would like to know what is the relation between flow and performance of pressure guage other parameters i found in the data sheet are pressure max. 1ksc temperature max. - 50 deg c line size - 80NB operating range - 1ksc pr. guage range - 0-2 ksc thank u,
WHAT IS MEANT BY PROJECT MANAGEMENT STRATEGIES IN INSTRUMENTATION?
I will attend an interview with GasGas company for a position of Instrument Technician ( Offshore )in next month can anyone tell me what questions they will ask. Thanks in advance.
how to calibrate load cell
what is o2 analyzer and how it measured ,what is the role of this analyzer in cfbc boiler...
Explain the working of an enraf level gauge.
TECHNICAL/ARTITUDE
If i have 4 Allen Bradely make RS logix 5000 PLC and for viewing that we are using 4 RS view SCADA for 4 different packages. Now, I will want to view two packages on only one SCADA. Then how i will do it?
With N nodes and B branches what will have a network ???