1 cft have 13.5 No of Bricks, can someone help me to answer me for it's mathematically proof?
Answer Posted / sajeesh
depends upon the size of bricks
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
How can you achieve soil enforcement?
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
The foundations are placed below ground level, to increase?
in the construction of residential building what type of tank are used?where?why & what is its purpose?
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
The largest size of paper used in plotter to print the drawing made by Autocad .
hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
what is E
What is the meaning of a blue land surveyors flag?
detailed calculation of the amount of cement used?
how many kg of 20mm, 10mm, dust available in one ton stone boulder
Define What are the reasons for geotechnical site investigations in Uganda?