Answer Posted / prasad bishetti
Sp.gr of cement and Unit wt of cement is totally different.
Sp.gr = 3.15
Unit wt= 1480 kg/cum
Is This Answer Correct ? | 8 Yes | 3 No |
Post New Answer View All Answers
1)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
.5Ast
What is alternate bid?
How to hide dimensions in autocad?
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
significance of specific surface area of particles?
Which IS Code/American Code applied for coupler test of steel
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????
Explain the water bound macadam roag
for pretensioning which will yield first and same for post tensioning?
at which depth the construction of tunnel is economical from cost and engineering aspect.