tell me about Woodward505 Function as a point of Instrument
Engineer.
Answer Posted / muataz
how to use 505E for standard steam turbine
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
flow transmeter accuracy 0.075% of full scale & find ucertainty is 0.025 % so what is maximum limit band of uncertainty
Linear amplifier.
what is the procedure of belt scale calibration?
What is exact difference between the panel earthing and system earthing in DCS system. What is the value of resistence.
What are different types of orifice plates? State their uses.
In Safe Guarding test what means by "Failed to Danger" ?
TEMPERATURE VARIATION FOR FREQUENTLY.
Please can anybody help for control valve sizing step by step procedure?
Do you have reference list?
what is zero and span ?
what is the PC interface and software for connection to ABB logic module “ LM011-CE18RAC “ ( for Programming ) ??
How to Calibrate Vibration Probe (Axial, Redial) in field
why we r opening HOT BYPASS valve during startup of a compressor?
A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.