std heights of c.p fitting from ffl like health faucet,wall mixer,shower arm,european commod,wall hanging commod etc.
Answer Posted / saif rizvi
Health faucet 600mm
Wall mixture 1000mm
shower arm 2100mm
Wall w/c 400mm
Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
what is pqc
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
How did street originate in the plumbing term street ell?
What is the difference between built area and super built up area?
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
sir, whitch is the best book (writer name) for prepration of gate....
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
how to calculate the weight of concrete
mix design procedure for 1:6 cement mortar
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
afe or not
can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?