Answer Posted / ashwin
200 mm
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
what is the steel difference between np-2 and np-3 pipes and weight also
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
what is tension footing?
How to activate isometric axes in cad?
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
how to shuttering is used in slab
Cement consumption of one cubic meter of aerocon blocks masonry?
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..
how clculate excavated or backfilling quantity by simpson's rule
How to fix toll charge for a particular vehicle at toll booths in a highway?