What is the strength of concrete with ratio 1:4:8 as per British standard or ACI
Answer Posted / vasikh ali
Thats M7.5
M5 is 1:5:10
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
what are RIB slabs explain about it
how many shuttering material required for 1000 sq.m built up area.
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
Define Who designed the city of Washington DC?
How much material is required for constructing a 2 Lane 2Km rigid pavement road
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
Explain the design for rcc multi-storied building?
types of survey and levelling instrument ?
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
what course did you consider thinking before you enrolled in college?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
What are the main reasons for conducting pull-out tests for soil nails?
What is the method of soil replacement test?