Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Which protection detects both AC and DC?

Answer Posted / joel obrador

Circuit Breaker/ Fuse/ Thermal Protection

Is This Answer Correct ?    10 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the advantages of speed control using thyristor?

1103


i have to install a HT panel, what components, I have to use in this and what will the diagram of that diagram,please tell me each and everything.

1796


what is solkor relay and which condition it will act?

3338


How can eliminate noise problem inside temperature controller temp. variation due to contactor chattering problem.

1608


what is the power rating of CPU, CRT type moniter, LCD type moniter,scanner Approx.

2177


An impedance of 100 ohms resistance and an unknown inductance is connected across the capacitor. The resulting impedance is a pure resistance of 500 ohms ifω = 10^5 rad/sec. calculate the values of inductor and capacitor.

1405


What is the difference between PS & metering CT (5p20,0.5 etc.)? Why in PS class CT only Vk is given ? Is PS class CT is more accurate than metering CT?

1101


Can anyone tell the proper diagram of star delta starter????

1913


what is accuracy ? in any meters , coils accuracy . how can u defined that ?

2405


DESCRIBE THE CONSTRUCTION ANDOPERATION OF BELT CONVEYORS AND SCR CONVEYORS , DRAW NEAT SKETCHES

2052


1) Explain why we don't link the two earthing system ht and mv on a pole mounted transformer sub-station.

1776


What will happen if we on 200kvr capacitor bank(11kv in bus)If there is low load on transformer (1.5 mva 33/11 kv)

1549


sent to a site and asked to explain how you would like a twenty seven flour building should be supplied with lighting and sockets plus a water boiler.

1926


i applied for c licence with my one year apperents trainee and i have attaced with A grade contractor company experiance that is for 14 monts experiance this document is sufeicant for c licence? pls tell why they rejected

2226


What is vacuum circuit breaker.define with cause and where be use it device?

1285