In the cement the compound quickest to react with water
Answer Posted / kcgurjar77@gmail.com
Tri calcium silicate
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
what is the types of surveying?which type of survey carrying for type of work?
What is missing report and how to prepare
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
What are the RISKS during the project construction?
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
Which are the top apps for you civil engineer?
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
for pretensioning which will yield first and same for post tensioning?
do we decide reinforcement steel , based on bending moment ? give example with continous slab?