Advantages of short circuit and open circuit tests of a
transformer?

Answer Posted / hassan

Open circuit test : Finding (Core losses) Rc & Xm.
,Finding Voltage with on load.

Short circuit test:Finding Equivalent (Resistance of windings & leakages flux) .

Is This Answer Correct ?    4 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is meant by bus bar protection?

643


Describe the test procedure to determine the vector group

1594


what are factors to be consider to design a HT & LT motor?

1816


how to test YNyn0 vector group in transformer?

3201


What is the end effect of linear induction motor ??

1569






can i use 4 number of circuit breaker as single phase manual change over switch? if yes then how plz also send ckt diagram at nazimzamurad@gmail.com

1617


what is the importance of Partial Dischage test for Electrical Equipments

1465


how to calculate the breaking capacity of different breakers.

1694


Hi everyone, I'm Lachuu, recently joined automation company as PLC Engineer. I have certain basic question, I request all big gurus and seniors to answer these question. Because this will be very helpful to me as well starters like me. How to design a control circuit (ex: pick & place - my current project) Yamaha robot PxYx series controller RCX222, using 6 cylinder double acting, plc keyence kv p16r 2 expansion unit for input and output each. How to select panel terminal mcb elcb powersupply. My main concern in some projects how to select dc power supply, mcb rcb(I came across dif bt b c d curves, but stil confusing, pls help me :-(. I would really appreciate all who are going respond to this question.

1503


sir& friends i want the collection of recent quetions asked in interview of top most companies please send me on my email san.jsr@hotmail.com

1342


What is reactive power and where it is used.

1192


When we giving the 3 phase supply to ups system how to coming netural?

1641


What is the bundle conductor?

729


Show the schematic arrangement of diesel power station layout and give its principle of operation.

2534


We have received supplies of the ordered material. payments against the supplies also released. Where ST paid 4% against form C. Meanwhile it has been observed that 25% of material supplied was defective. Please suggest whether the issuance of C form from our side would be stopped till settlement of liabilities.

1463