adspace


What does it mean 3/2 sov

Answer Posted / pankaj bhor

3 for 2 airvent & 1 inlet of air, 2 stands for cylinders two ports which are used for open and close the cylinder

Is This Answer Correct ?    0 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

any body please send me the old question papers of ongc test.

2178


Question on maha cement

810


sir, give me placement papers and interview quistion of birla group company of copper.

2933


this site is owned by an nonsense

2407


any one can send me instrumentation previous interview papers? I prepare for MNC Company Interviews? my mail id- Rakesh.Golla@dodsaldxb.ae , and another mail rakesh.gvk@gmail.com

2047


plz you help about Que paper of mahagenco previous your,any model paper relad to it{maharastra power genration}

2408


pls suggest suitable MOC of diaphragm for pressure measurement of UREA grade solution service fluid.

3227


give me all the details about the interview and which type of question being asked

2301


What are the key features of a Distributed Control System? describing the various layers (sensor through to business system interfaces) as well as the hardware, software and security aspects of the DCS.

2298


hi sir yhis is zahid ali i am preparing for the jspl at oct.4.please send me the recently updated sample paper.

2266


Can any one tell me what type of question asked for instrumentation and control interview panel??? pls mail ramashankar.goel@gmail.com

982


principle of dead weight tester ?

2166


A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

2263


please any body have most important data for study for saudi aramco test of instrument QC thanks email shahnaveedullah@gmail.com

1751


hi i am eswar i want to know the instrumentation interview questations for eil(engineers india ltd) i have applied for engineer post in eil please help in this.my mail id eswar310@gmail.com

2647