What does it mean 3/2 sov

Answer Posted / nvr

in 3/2 SOV. 3 stands for total 3 nos of port.2 stands for supply input and output.remaining 1 no port for drain/vent.

Is This Answer Correct ?    9 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

send me model hpcl questions pleas..........my mail id mohideen.dharvesh@gmail.com

2333


hello can yoy pls send me previous papers of jindalpower and steel ltd.....'m from instrumentation..... mani1048@gmail.com

2076


hi sir yhis is zahid ali i am preparing for the jspl at oct.4.please send me the recently updated sample paper.

2265


please any body have most important data for study for saudi aramco test of instrument QC thanks email shahnaveedullah@gmail.com

1747


any body please send me the old question papers of ongc test.

2177


Can any body help to get Rsemulator 5000 free from internet if possible then give me any link or any help .

2581


I am manjunath having exp in maintenance of chemical plants,know i want to do a design course INTOOLS,after doing design course can we get jobs in design field.sinve i dont have design exp..

1838


hi i am eswar i want to know the instrumentation interview questations for eil(engineers india ltd) i have applied for engineer post in eil please help in this.my mail id eswar310@gmail.com

2646


Can any one send me IOCL instrumentation question papers.. i dont know the pattern of the questions and what to prepare can any one help me on this .. my email id is anwarnishil@gmail.com

2342


send me last 5 years questions asked in rrb chennai, for section engineer

2181


please send data bank of quetions answers on analytical instrumentation.

1986


A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

2262


can any one tell me when ongc placement test and its forms is available????/ pls tell me if u know

2197


where cascade loop use ?

1787


Question on maha cement

806