Can anybody help me by attaching files , formats for
quality checks of common building materials like cement ,
concrete , bricks , sand and aggregates?
Regards,
Answer Posted / alvish
Dear chatterjee sir,
kindly send me the formats of quality check
my email id is - alvikylm@gmail.com
raegards
Alvish
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
Pls explain me about tension and compression in a flat slab
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
Define block?
Where is the worlds longest elevator and how long is it?
what is directivity effect?
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
Explain what is change order request?
What is the difference between chamfer and fillet?
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?