Answer Posted / abdul rauf
This wheels moves over rail which are place another girder
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
what is the method used for marking of cantilevers in hirise buildings by using theodolite
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
What are the advantages of cad software’s?
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
residential buildings,mixing of concrete,structural,construction material,site handling.
at what pressure ply-wood is obtained by gluing wooden sheets
what post do you prefer to work in this company and why do you think you can serve better in such position?
trapozidal
Which percentage of carpet area use in plot area of office building.
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
mix design procedure for 1:6 cement mortar
what is castigliano theaorem
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.