Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

List out the densities of different construction materials
such as brick, steel, sand, aggregate etc...

Answer Posted / ram kewde

Cement -- 1450 kg/cum
steel -- 7800 kg/cum
PCC -- 2400 kg/cum
RCC -- 2500 kg/cum
sand (loose ) -- 1400 to 1700 kg/cum
sand (packed)-- 1600 to 1900 kg/cum
ACC sheet -- 17 kg/sqm
Timber -- 720 to 750 kg/cum
clay bricks -- 1900 kg/cum
20 mm Aggregate -- 23000kg/cum

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

2326


Will going from a 3-tap to 6-tap increase water pressure?

1103


What is meaning of FREE STANDING STAIRCASE ?

3088


Explain the design for rcc multi-storied building?

1199


how to tie 10 legged stirrups

6595


what course did you consider thinking before you enrolled in college?

2391


what is the weight of 10mm,20mm,40mm aggregate

2507


Gidc technical que paper

1809


Define polar co ordinates.

1271


Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem

2800


how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high

1971


Explain what are the phases inspections are done by local authority while construction?

1248


Slab quantity 

2101


Why reinforcement done in shorter span in two way slabs

1864


how much one carpenter can doing shuttering of slab in one day

3384