Answer Posted / sachin mogal
Dewatering is the removal of water from solid material or soil by wet classification, centrifugation, filtration, or similar solid-liquid separation processes, such as removal of residual liquid from a filter cake by a filter press as part of various industrial processes.
Construction dewatering, unwatering, or water control are common terms used to describe removal or draining groundwater or surface water from a riverbed, construction site, caisson, or mine shaft, by pumping or evaporation. On a construction site, this dewatering may be implemented before subsurface excavation for foundations, shoring, or cellar space to lower the water table. This frequently involves the use of submersible "dewatering" pumps, centrifugal ("trash") pumps, eductors, or application of vacuum to well points.
| Is This Answer Correct ? | 9 Yes | 0 No |
Post New Answer View All Answers
Wats the formula of eccentric footing and how was calculated from concrete qty
how many time use of plywood shuttering and IS code
a butt weld is specified by
What is the outturn of Ceiling plastering
How much quantity of cement,sand,stone used to build 1 cum of cc road??
what is the maximum number of course that can be laid according to IS code and the max height.
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
What was asked in isro civil interview
what is the water-cement ratio of mix design while 30mpa in 7 days?
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
how to calculate number of bitumen for road asphalt
how to calculate the length diamond shaped striupps in column
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
why top layer of block work shoud be full size if any cut block adjustable than another layer?
Which ratio use for cement selery???