Please let me know the simplest way of Calculating mix designs for any grade.
Answer Posted / chandan sasane
its very complicated to know simplest way :)
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
Define What is rigging?
Define What is the meaning of a blue land surveyors flag?
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
04. a. Slenderness ratio…………… 1 b. If the height of a stage is 15-0 & dia. of the prop is 5, the slenderness ratio is….… 1 c. If the height of a stage is 10-0 & dia of prop is 3, the number of bracing will be…… 1
what is escalation?how it is done?
Special thing in designing a overhead reservoir ? which is different from an ordinary design
Why are the bolts that hold steel rails together in oval holes?
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .
why is M30 grade Concrete use for Foothing & Column M50
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
"Gates of the dams are generally designed of curved shape". Why?
how to determine H- zone in a column? where it will occur?