Answer Posted / rajesh
Extra low voltages means reduced voltages that are used for lightings in parks,swimming pool to eliminate risks of electrcal shocks.
AC voltages below 50VAC and dc voltages upto 120V are cosidered as ELV.
| Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
In between UPS out going changer over switch and ups raising main input, both side cable gland producing heat but the cable doesn't get heat,Why?
what is DRP panels?
If any HVDC line is going with positive & negative(the negative usually have return path of current with earthing electrode). Now the question is if this HVDC earthed electrode which is using as return path and earthed any nearby 400kv or 220kv AC substation equipments. which will be the impact of this on AC substation & its equipment, how severe may be this and what should be the minimum distance require between HVDC earthed electrode and AC substation equipments? It's really an high engineering level question...Dare to answer and increase your knowledge.
when we gave dc supply to 220v dc motor its rpm is 1200. then we gave 180v. how many rpm of its motor. gave answer with calculation at my ID.... ravizak@ymail.com
How can we select suitable capacity generator for three phase load (inductive load) and how to take study analysis in 3 three phase load system ?
please send 5yearje solved papers on my email himmatsinghnathawat@gmail.com
dc supply given to dc generator winding.how is possible? my knowledge is saying the winding will burn. please reply.
How to connect the chemical earthing and complete process tell me plz
What are the limitations of Kirchoff's laws?
how to calculate the tarriff for an industry whose kva demand is 10 mva
how we control automatic generator i'e with to supply (main supply and local generator) when the main supply was break to supply the local supply automatically to begin supplying power.I now this control circuit is the combination of contactor time delay contactor switch and overload relay .but my question is how we combine those component thank you
is there any role of power factor with frequency variation? and how we can manage the frequency variation?
In our factory so many iron pillors are exists for supporting the shed/Hangar. If do more no of earthings at one piller instead of doing more earth pits in many locations and running earth strip around the hanger, I can save the money. Please suggest this method is acceptable as per Is specifications though the Earth resitance of the farthest piller is with in the limits as per IS specifications.
What is the rating of a circuit breaker needed for 300 kv load in 33KV supply line of 33/415 transformer ? Whether 800/1200 amp vaccum circuit breaker can perform for a 33 KV line in input in 415 volt in output of the transformer ?
HOW TO CALCULATE THE REGULATION OF 100 AND 25 KVA TRANSFORMER