Answer Posted / suresh bariya
Should be at least 10 days.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
How will you Engage Labours on Site?
What is the basic difference between OPC
How to cal. The weight of hollow pipe?
Who name us Engineer & Why?
how to compute slab reinforcements on step by step procedures??
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
What is specific gravity???
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
types of survey and levelling instrument ?
how calucate cement sand ratio for plstering
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
quantity of material needed for rubble stone masonry for 1:4 and 1:6
what is features of a typ-ical modern air-conditioning installation?