how to calculate cement bag in RCC
Answer Posted / karthik
M20 = 1:1.5:3
Volume = 1+1.5+3=5.5
Total volume ingredients for using =1.57
Volume of broken stone Require = (3/5.5) x 1.57 = 0.856 m3
Volume of sand Require = (1.5/5.5) x 1.57 = 0.471 m3
Volume of cement = (1/5.5) x 1.57 = 0.285 m3
= 0.285 x1440 = 411 kg
For 1m3 of M20 (1:1.5:3)
Broken stone = 0.856 m3
Sand = 0.472 m3
Cement = 8.22 bag
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
What is .Dwg?
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
What is critical path method (c.p.m)?
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
Explain creep?
How to calculate construction cost of residential building in mumbai
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
How many lbs are there in a yard?
reinforcement slab, beam and column formulas?
What Are The Steps Involved In The Concreting Process, Explain?
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
What is dead load impact load live load
on what basis the partial factor of safety are decided? form the load combinations
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,