Answer Posted / gurvinder singh
It is a type of rewirable fuse which has two parts. The part which carries the fuse element is known as kit and the fuse base is known as kat. The kit is fitted on kat and the circuit is ready to use
| Is This Answer Correct ? | 19 Yes | 4 No |
Post New Answer View All Answers
Can u Explain about the electronic trivector meter and the use of data converters in them?
How to synchronization will be done between two DGs ?
which one is more efficient, torq, power & ecnomy with the same frame size AC motor / DC motor?
How many types of electrical earthing are there?
what is mind in cable
how does a submersible pump work..?
is it possible for different brand of H.V transformers to run or operate in parallel to each other? if so how much disturbance can this affact the H.V bus bar?
Meaning of ingrace protection for motor.for ex IPXY
PLEASE SEND THE PREVIOUS YEARS QUESTION PAPERS OF RRB JUNIOR ENGINEER-ELECTRICAL
Is it advantages of having star-delta vfd than normal star vfd , if yes why?
What happen in ups if phase reverse?
what is self capacitance of inductor
Dear all, I just want to ask an expert on this forum for some insights. For the magnetic balance test, when applied voltage on a Delta-Star transformer e.g. Dyn11, the following relationships apply for HV side: 1. H1-H2 = H2-H3 H3-H1 2. H2-H3 = H3-H1 H1-H2 3. H3-H1 = H1-H2 H2-H3 For the LV side also: 4. X1-X0 = X2-X0 X3-X0 5. X2-X0 = X3-X0 X1-X0 6. X3-X0 = X1-X0 X2-X0 Is there a similar pattern for Y-d, Y-Y, D-d? And how about Y-z, D-z, Z-y transformers? I've tested a YNzn5 transformer and for LV side I don't see the pattern. In this particular case I got for LV side the following (see values below): H1-H0 H2-H0 H3-H0 X0-X1 X0-X2 X0-X3 128.0 119.9 7.2 29.2 13.3 15.8 70.7 128.4 59.2 23.4 22.0 3.6 7.2 120.1 128.1 13.4 29.3 15.8 What is the relationship here for LV? For row 1 I see the relationship, for row 3 I also see but it's shifted, but for row 2 I don't see such relationship. Any suggestions, answers, someone?
What are conduct on the testing in cf in ur site?
Define maximum demand?