What is difference between load bearing structure and frame bearing structure ?
Answer Posted / harsh rathod
In Load bearing structure load is directly transfer to the foundation. When in frame bearing structure load is transfer to beam to column in from uper story to lower story then finnaly load is indirectly transfer to foundation.
Is This Answer Correct ? | 10 Yes | 0 No |
Post New Answer View All Answers
What tor stands for in tor steel?
Give me an example of a time when something you tried to accomplish and failed.
What is progress payment?
What are some structures that may be subjected to fatigue?
How much cement is require in one sqft area in a G+3 residential construction.
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
what is the basic difference between Coloumn & Shear Wall
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
How to find the cuplock pipe qty in staging for Minor bridge?
what is stressing
Forces in a Shear Wall are in plane or out of plane ?
What do you understand by “preset” during the installation process of bridge bearings?
What are the phases inspections are done by local authority while construction?
What do you mean by honeycomb in concrete?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??