Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why not maintain Ph 7.0 in Boiler because 7 Ph is not acidic and not basic.

Answer Posted / alok bhattacharya

We need to mix scavenger in feed water in order to make it oxygen free which helps boiler from corrosion. Phosphate dozing is primarily done for this purpose and this raises PH value and usually maintained around 9. Moreover phosphate dozing helps to make magnetite layer which inhibit corrosion.
Acidic water is prohibitive in boiler for above reason, i.e.
Ph below 7.

Thanks

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

operation

1878


why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.

3238


dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job

2531


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

2469


How do you consider that you can improve and what assistance do you need to achieve this

1750


LAPT working in alternator / generator

3614


what is the difference between compensated & normal drum level in boiler drum?

1788


Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.

2406


what is natural frequency of turbine shaft .

2271


How We Calibrate the vaccum transmitter?

1959


What is LB-SR.

2990


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

992


what is restricted earth fault explain in details

2033


explain how the third harmonic content of the magnetising current affects transformer design

3261


How to calculate power press toneage

2048