Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how do we find the nos of bricks in 1 m3 brick masonary

Answer Posted / yogendra kumar

We can solve with size of bricks
If the size of brick is 22.86×6.98×10.795
With the size of mortar take 10mm thesize of modular size of brick is
23.86×7.98×11.795
Volume of modular size of brick is (23.86×7.98×11.795)=2245.80cm3=0.00225m3
In 1m3= 1/0.00225=445.27bricks
These bricks with the mortar
If we want the quantity of mortar
Then volume of standard brick ×total bricks with mortar= (22.86×6.98×10.795)×445.27=0.7669m3
And volume of mortar =1-0.7669=0.2331m3
Then we can find the brick masonry with=445 bricks
And without = 1/(22.86×6.98×10.795)=580 brickAnd
mortar volume we know the mortar is 1.35 for 1m3
Then for 0.2331 =0.2331×1.35=0.3146m3

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the types of surveying?which type of survey carrying for type of work?

2106


what is the specific gravity of rubble in plum concert

1407


What are the advantages of building a dam on the river nile?

1065


What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?

1055


How to find out slope footing concrete

2885


How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?

1853


all technical question

2204


What are some facts about concrete?

1113


How is make concrete cube?

1151


Explain what are the phases inspections are done by local authority while construction?

1129


acceptance criteria for concrete works

2139


Dear Sir I Mahesh C. Bhamre have already given a Exam for Superintendent Officer / Public relation Officer Exam Dharmday Aaukta held at Nashik on Date 29/08/2010. My seat no was 5040247. and my cell no is 9822677994. and my mail Id is - mahesh.bhamre@rediffmail.com So can you pl send me details of result of respective exams. Thanking you in Anticipation.

2224


What is the use of extruded feature in solidsworks?

1177


PL.tell me about civil engineering questions with answer

2485


Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40

94306