why steel stirrups in column have more spacing at center and less spacing at both ends??
Answer Posted / venkat
Max shear force act near the ends then max shear rainforcement privide at the ends
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
Define line type?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
What are the different softwares used for cad?
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
In case if concrete box girder bridges how is the number of cells determined?
Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?
how many type of admixtures for water stored structure?
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM