koi bta sakta ha ka steel ko calculate krna ka full mathod pls
Answer Posted / vikas mishra
((d2/127)*(pi/4))
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
What is the tallest man made structure in the world?
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
Slab quantity
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
what"s the sort of beams?
What are the different types of foundation?
The largest size of paper used in plotter to print the drawing made by Autocad .
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
what is tension footing?
how can we construct building without foundation providing only grade beam at ground level
what is the basic difference between Coloumn & Shear Wall
Scaffolding IS code NO.
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)