Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

please explain power factor in simple words.....

Answer Posted / ali

The cosec angle bt voltage and curent is called power factor

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain the advantages and disadvantages of hydropower plant?

1137


what is cause of static electricity? I experience shock when i touch metal equipment in a room ,furher check shows earth leakage showing 80ma at the DB near to the 400 MCCB?

1911


difrent between vcb acb sf6 and mccb breakers

5443


Name one of major transformer company in KSA ?

1218


do we use neutral grounding for resistive balanced load? if we use what happen?

1796


What are operating procudures & Safety precautions to be observed while operating OLTC in manual mode ?

1981


Can any one know what are the symbols at the down (below) the analog ammeter??? there are 4 symbols which are they ?????

1910


What is stacking factor? What is its approximate value?

1448


What will happen if the voltage in my house drops from 220V to any lower voltage?

2203


What is the maximum number of swithes that can be connected in series up to down stream point in an LV Distribution system?

2014


How much depth n width required for laying of 1X70 Sqmm Cable in Desert???

1619


234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,

2035


pls someone send me sample question papers along with the key.thanks in advance

2392


How to calculate the phase to phase clearness of HT /// LT bus bar?????

2084


what is the use of vcb & isolator in substation?

2383