What is the approx construction cost of 1 lac Sq.ft ..in any place city or town?
Answer Posted / umair
500000000INR
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
sir, whitch is the best book (writer name) for prepration of gate....
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
how to convert cement, sand aggregate quantity from M3 to kg with full description?
Minimum concrete cover in slabs, columns, beams, foundation and other st?
What is fineness modulus ? and its sieve # ?
What are the different types of foundation?
How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me
What is the density of DLC & PQC and how it is differ from normal concrete?
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
In a concrete grade C35A, C & A stands for what and equalent cube strength?
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
what is the hanekom repairing material after concreting work
what is escalation?how it is done?