for concrete cubes samples.. what if the 7 days gain the
strength of 42.34 mm/2 and the 28 days only gain the strength
of 37.5 mm/2?

Answer Posted / vikranth geddam

sampling and curing for 7 days might be correct. And for 28 days sampking might not be done correctly and at the same time curing also.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

where i can get material costs on weekly basis

1660


which method is used in semi-rigid connection design??

1801


estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?

1448


5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)

1653


How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)

1383






What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m

1745


density of crush sand & crush stone or grit powder

6299


Aptitude, reasoning, quants, verbal and technical question

988


what is the minimum compressive strength of clay brick

1757


1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25

2138


if dia of slab beam bar is38mm what its clear cover any method of provide clear cover

1639


how many time use of plywood shuttering and IS code

2689


a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing

2793


Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.

2768


What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?

1170