how to know the one way or two slab
Answer Posted / siva sankar
When ly/lx less than 2 than the slab will be two way slab vice versa..
ly/lx>2 one way slab &
ly/lx<2 twoway slab.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
wat would be the probable interview questions and GD topics for IOCL exam?
what is BPM in concrete demolition hammers. what is better a higher value or lower
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?
Define What is unit weight of normal concrete?
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
Questions related to civil.engg in company
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
how to calculate MR 9(derivation)
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?