1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3

Answer Posted / yashvant

80 no. blocks per 8 hour duty and 2 hour overtime is enough as per company standard.

Is This Answer Correct ?    20 Yes 23 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is differences between ferrock and concrete ?

1428


We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?

1600


how can we calculate steel value, depending on load

1697


What is the standard volume of pharma in cub ft

1290


how to calculate weight of 1.8 cum of aggregate

1294






what do you understand by M25 concrete

1927


In block work seawalls what is the purpose of slip joints?

757


What quantity of 1.0 m3 bricks required?

661


Minimum concrete cover in slabs, columns, beams, foundation and other st?

675


Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?

1890


How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57

1506


what is the effect of duration of earth quake on framed structures ?

1805


What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.

1558


How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.

2158


WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)

3039