1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3
Answer Posted / yashvant
80 no. blocks per 8 hour duty and 2 hour overtime is enough as per company standard.
Is This Answer Correct ? | 20 Yes | 23 No |
Post New Answer View All Answers
what is differences between ferrock and concrete ?
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
how can we calculate steel value, depending on load
What is the standard volume of pharma in cub ft
how to calculate weight of 1.8 cum of aggregate
what do you understand by M25 concrete
In block work seawalls what is the purpose of slip joints?
What quantity of 1.0 m3 bricks required?
Minimum concrete cover in slabs, columns, beams, foundation and other st?
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
what is the effect of duration of earth quake on framed structures ?
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)