1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3

Answer Posted / yashvant

ready made plaster work one meson can do 12 square meter per 8 hour duty and 2 hour overtime this is enough work as per construction company standard measurement in Dubai.

Is This Answer Correct ?    34 Yes 15 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Slab quantity 

1606


Can we use the flyash bricks in brick bat coba?

1074


What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.

1609


How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?

1410


silt%= silt volume/ silt+sand volume is this right?

1506






50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?

1313


How much quantity water should be placed in one cubic meter area?

894


How to identify the vitrified tile and ceramic tile by observation only after executing the job.

512


i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?

1486


Please design 12.5m long dubbly beam

1475


How many cement sand ballast in cc 1:4:8 40mm

1538


What are the common ways of demolition?

722


What is absolute coordinates?

700


I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.

1765


Design a rectangular channel.

2461