Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Calculate no of brick req 230cmx115cmx100cm

Answer Posted / mehtab javed

No. of bricks=1322.5 or 1323

Is This Answer Correct ?    3 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit

6496


Explain the different types of building contracts?

1094


Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?

1870


What are the phases inspections are done by local authority while construction?

1214


What happens to Load at yielding ?

1397


by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)

2144


Which tests are performed on soil to decide the type of foundation to be provided.

2140


Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand

1817


What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.

2062


How many lbs are there in a yard?

1208


What is Architect-Prepared Contract?

1168


Explain what is 1/8 on the architect ruler denotes?

1136


Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––

2391


how to control PQI (Project Quality Index)

10841


PL.tell me about civil engineering questions with answer

2523