1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3
Answer Posted / rajan pandey
their two ans is right
Is This Answer Correct ? | 13 Yes | 3 No |
Post New Answer View All Answers
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
How do we calculate the power of centrifugal pump?
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
how to control PQI (Project Quality Index)
3. What are the disadvantages of your present job, things you do not like about it?
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
what is right & short method of measurement of slab&beam
Water filter calculation formula
Define angular dimension?
Wat is meant by Aecron brick?
What is the general specifications of a bituminous pavement road?