1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3
Answer Posted / rajan pandey
their two ans is right
| Is This Answer Correct ? | 13 Yes | 3 No |
Post New Answer View All Answers
How to calculate unit weight of concrete for m40 grade.
how to determine H- zone in a column? where it will occur?
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
What do you meant by gui?
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
what is m30 in concrete tiles
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
What tor stands for in tor steel?
what is the maximum number of course that can be laid according to IS code and the max height.
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
What is the strength of 1:6:12 mix?
though u r a civil engineer, y r u interested in tcs???
What is the use of extend command?
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.