i Have Completed a Intermediate Vocational (Construction
technology) with Bridge course ,iam elegible to join in
Institute of Surveyors(india).
Answer Posted / mohd farooq shareef
I just pass Intermediate Vocational (Construction technology) not Bridge course
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
Is there any course for billing available in Mumbai? If yes then please mail me the details..
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????
Explain how you can use different dimension tools in CAD? What are the different dimensions available?
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
Explain what is progress payment?
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
What materials were used to build the golden gate bridge?