What Should be the CBR Value for Transported (Selected)
Soil.whether it can be 5% or not ?
Answer Posted / sai
CBR value for transported soil may be less because void ratio is more..
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Form where IS456 is adopted in 1978?
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
what is the water-cement ratio of mix design while 30mpa in 7 days?
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
What is type failure of road surface? how to repair the failure of road surface?
What is the use of mirror command?
How to do base isolation for RC framed structure using ETABS software?
what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????
When column of building is abutting the boundary line,then suitable footing advised is
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
How much for the BRC lapping in full yield and half yield < and which table to get it ?
quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data
what mean By core Billing