List out the densities of different construction materials
such as brick, steel, sand, aggregate etc...
Answer Posted / d mcgregor
Plasterboard
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what are the challenges of being a team leader and a supervisor?
Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai
How to calculate the crank rod in slab
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
load combinations how many types for staad design purpose?
Define What are the materials used in building a gravity dam?
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
What is the difference between a wood shake and wood shingles?
what is the types of door's wood?
How much 1 cum of M15, M20 & M25 concrete weigh?
for pretensioning which will yield first and same for post tensioning?
can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.